- This topic is empty.
Viewing 1 post (of 1 total)
Viewing 1 post (of 1 total)
- You must be logged in to reply to this topic.
51 PANACEA
LENGTH
51' 0"
BEAM
14' 8"
50 EVOLUTION
LENGTH
47' 6"
BEAM
13' 8"
475 PANACEA
LENGTH
47' 6"
BEAM
13' 8"
438 EVOLUTION
LENGTH
43' 0"
BEAM
12' 8"
43 NOMAD
LENGTH
42' 7"
BEAM
12' 8"
427 NOMAD FE
LENGTH
42' 7"
BEAM
12' 8"
41 VALOR
LENGTH
41' 8.5"
BEAM
11' 9"
409 VALOR
LENGTH
40' 0"
BEAM
11' 1"
41 PANACEA
LENGTH
40' 0"
BEAM
11' 9"
41 NOMAD
LENGTH
40' 0"
BEAM
11' 9"
407 NOMAD FE
LENGTH
40' 0"
BEAM
11' 1"
375 NOMAD SE
LENGTH
37' 6"
BEAM
10' 6"
375 NOMAD FE
LENGTH
37' 6"
BEAM
10' 6"
345 VALOR
LENGTH
34' 6"
BEAM
10' 6"
345 NOMAD SE
LENGTH
34' 6"
BEAM
10' 6"
345 NOMAD FE
LENGTH
34' 6"
BEAM
10' 6"
327 NOMAD
LENGTH
32' 7"
BEAM
9' 10"
327 VALOR
LENGTH
32' 7"
300 NOMAD
LENGTH
30' 0"
BEAM
9' 6"
477 Evolution
LENGTH
47’ 6”
BEAM
13’ 8”
“Hi Joe,
just over 6 months ago I replaced the original Bennett tab control switch with the new EIC kit. I now find the connections on the relay module have corroded and this and the blue wire will have to be replaced. My installer mounted the module in the bilge area (of my 30 ft. open) as the wires from the pump to the module limited where it is placed. I am wondering where does Intrepid place the relay module on new installations and if longer wiring is needed for the placement if not in the bilge area? I am concerned about putting a new module in the same location and having to replace it in another couple of months!!! Your advise will be appreciated.
Thanks for your time,
Brian”